An architecture practice in Ahmedabad. We draw buildings made of what is nearby, by people who live near it.
Every material on our drawings comes from within two hundred kilometres.
That constraint is not romance. It is the reason a wall can be repaired in 2060 by someone who lives on the same road, using the same brick, without a drawing from us.
We work in load-bearing masonry, timber and exposed concrete frames, and we detail them to be understood by the people building them. Nine of our last twelve buildings were put up by contractors from the same district as the site.
Six materials, and the distance each one travelled.
Kiln House is the shortest supply chain we have managed. Nothing on the drawing came from further away than Morbi, and the sand came from the riverbed you can see from the terrace.
Drag the drawing sideways
A wall is seven decisions thick.
This is the drawing a mason actually builds from. Every layer is named, sized and sourced, because a detail that has to be explained on site has already failed.
Drag the drawing sideways
Selected work
All six projects- A-201Kiln HousePrivate residenceBhuj, Kachchh2024Built288 m²
- A-202Loom WorksWeaving workshop and housing for 14 familiesBhujodi, Kachchh2023Built1,940 m²
- A-203Stepwell LibraryPublic library and reading gardenAhmedabad, Gujarat2026Under construction3,410 m²
- A-204Terra CourtNine apartments around a shared courtAhmedabad, Gujarat2022Built1,260 m²
How a building gets from a plot to a set of keys.
Survey and brief
Measured drawings of the plot, a light and wind study, and the brief written down in your words, not ours.
3–4 weeks10%Concept
Plans and sections at 1:100, one physical model at 1:50, and a materials board you can pick up.
6–8 weeks20%Drawing set
Details at 1:20 and 1:5, the specification, the schedules, and one wall built full size on site before anything is ordered.
10–14 weeks35%Tender
Priced bills from three contractors, interviews with each, and our recommendation in writing.
4 weeks10%Site
Weekly visits, changes redlined and re-issued the same day, and the as-built set at handover.
As long as the build25%Fees run between eight and twelve per cent of construction cost. Under forty lakh we work to a fixed fee, agreed in writing before the first drawing is made.
On the boards
Updated weekly
- A-203
Stepwell Library
Brass screen at 1:5. The first mock-up came back too bright, so we are darkening the patina and hanging it again.
Week of 31 August 2026
- A-207
Well house, Mandvi
Second concept. Twenty-two square metres, one door, and a roof that collects more water than the house needs.
On the boards since 24 August 2026
- A-206
Salt Pavilion
Five-year inspection. The floor has cracked once, along the line we scored for it. Everything else is as built.
Visited 19 August 2026