A-203Ahmedabad, Gujarat · 2026

Stepwell Library

The reading rooms go down, not up. It is eleven degrees cooler at the bottom.

14.60 m

A-203 · Perspective from the north-east · massing only

Programme
Public library and reading garden
Floor area
3,410 m²
Height to parapet
14.60 m
Storeys
4
Structural bays
7
Status
Under construction · 2026

Ahmedabad's stepwells solved heat with depth and shadow long before anyone drew a section for a library. We borrowed the move directly: the stacks descend four levels around a planted well, and every desk sits on a landing rather than a floor plate.

Air enters at the garden, drops through the void, and leaves at the roof. Mechanical cooling serves the rare-books room only.

Handover to the municipal library board is scheduled for spring 2026.

Team

Ira Menon

Design lead

Devang Shah

Project architect

Vann Studio

Landscape

Ahmedabad Municipal Library Board

Client

Materials

Furthest: Perforated brass screens214 km

Board-formed concreteBatched on siteOn site
Dhrangadhra sandstoneDhrangadhra108 km
Perforated brass screensJamnagar214 km
Terrazzo landingsAhmedabad9 km

How it went

  1. February 2021

    Won the municipal competition with a section, not a render.

  2. March 2022

    Excavation. Four levels down, eleven degrees cooler at the bottom.

  3. September 2025

    Brass screens hung. The first patina was too bright.

  4. Spring 2026

    Handover to the library board, scheduled.